The First Process Bus in Thailand Utility, by ALSTOM GRID
- รายละเอียด
We are about to supply the first process bus protection system to one of Thailand large utility. The Agile AMU, ALSTOM MiCOM Px4x with process bus interface to be supplied in substation to replace the exisitng conventional hard wiring at 115kV bay.
MiCOM Alstom P14x IEDs software release
- รายละเอียด
MiCOM Alstom P14x IEDs software release
NEW Software 51 - Order Book Open
The MiCOM ALSTOM Feeder Management IEDs are now available with software 51. This software allows new enhancements and protection improvements, in P141-5 range of products.
The software 51 new features:
• New model option in P143 with 48 inputs and 16 outputs in a 80TE case (option letter P). This reduces Customer’s additional hardware for signalling and interlocking purpose.
• New minimum over current and earth fault protection setting, reduced to 5% from the existing 8% for applications with very high fault current.
• New addition of 8 sets of switch control logic, LN XSWI for controlling / monitoring of disconnectors and earth switches.
• Sum of switched amperes modelled on XCBR in IEC61850.
Time synchronized phasor measurement
- รายละเอียด
P847 PMU
Time synchronized phasor measurement (i.e. synchrophasors) involves measuring electric system frequencies and phase angles very precisely from 20-120 times every second at various points across the electrical grid over large geographic areas. Synchrophasor measurements are time stamped using very precise time sources such as the Global Positioning Systems (GPS) satellite signals. This provides very detailed and precise time synchronized measurements of the state of the electrical grid.
SA61850 for utility (MEA)
- รายละเอียด
TCCL to supply IEC61850 Substation Automation to MEA, Metropolitant Electricity Authority of Thailand, for Bangkrachao and Rassburana Substation. the SA system will be a full scheme PACiS/DS Agile ALSTOM latest IEC61850 control system. It would comply to MEA's most strengthen requirement of "Substation Automation System based on IEC61850 standard". the sytem due to be delivered Suptember 2013 and commsionign end of 2013 latest.
Substation Equipment for LAO
- รายละเอียด
TCCL supplied a package of 123kV CT,CVT,LA and 22kV GCB, CT, VT to LAO's Nong Bong substation. The equipment passed the commissioning end of last year December 2012 and the substation is live now.